Piping Engineer
Date: | 01/08/2023 |
---|---|
Place of work: | Port Harcourt |
Job Title: |
Piping Engineer (PIE) |
Reference: |
2006011 |
Project |
Rehabilitation & Revamping of Port Harcourt Refinery |
Job Location: |
Port Harcourt, Nigeria |
Hours/rotation: |
Monday to Saturday; No Rotation |
Salary range: |
Excellent salary package with benefits |
|
|
Job summary/Role description |
|
Construction Quality Engineer is responsible for the implementation of Construction Quality standard during proposal and execution phases, interfacing with various Group functions (e.g. Commercial dept, System Quality, Project Quality and Engineering). Moreover, he/she collaborate and assist with the AWP Champion/AWP Group Leader to implement the AWP Methodology and deliverables on the assigned projects, with particular reference to the CWP (Construction Work Package) related documentation pertinent to Quality. |
|
|
|
Duties and responsibilities |
|
-To collaborate in order to update the Engineering estimating criteria, taking into account the historical data of previous projects. -To assist the Project Leader and the Head of Department in the preparation of the execution strategy of the project, assuring its application throughout the duration of the project. -To share the activities among the assigned team and ensuring that proper information are available at any stage of the work. -To assist the subcontractor personnel on developing their activities. -To provide technical assistance to project team to solve possible discrepancies in drawings, specifications etc. -To keep subcontractor team fully informed of applicable codes, standards etc. - To ensure adequate flow of information within the drafting team and uniformity in design and drafting activities. -To require the proper authorization for any exception or modifications to the applicable procedures or to contract requirements, as set forth in the project coordination procedure. -To ensure that all comments are consistent and are included in the drawings according to the applicable procedure. -To review,issue and follow-up the General Notes on drawings, typical piping details, plot plan and scope layout study for the specific job. - To prepare and update the drawing index. -To assure that the 3D model answers to satisfactory design, practice, and participate in internal and Client model review. -To provide ‘feedback’ to the Project Leader concerning problems arising from application of standard methods and work instructions.
|
|
Special Requirements and Comments |
|
|
|
|
|
Person Specification |
|
Knowledge & Qualifications |
|
|
|
Experience:
|
|
Skills and Abilities |
|
|
|
|