Job Title:
|
Mechanical Engineer
|
Reference:
|
PIR 200700167
|
Job Location:
|
Abu Dhabi Branch– UAE
|
Job type/Contract:
|
Long Term
|
Starting date
|
May 2023 (Pending on
Visa/Approvals)
|
|
|
Job summary/Role description
|
|
|
|
Duties and responsibilities
|
To check that the said
schedule is kept to, and to promote action to recover any delay; To check that the equipment
and manpower employed by the Subcontractor are adequate and that the works
performed by the Subcontractor conform to design documents, Safety
regulations, and to the Quality level fixed by the same. To prepare the non-conformity
register for each Subcontractor and co-ordinate non-conformity resolution. To detect any design errors,
and where possible rectify the same or request the Site Engineer to make the
necessary changes. To check Subcontractors’ work
progress status sheets and sign the same for approval. To manage vendor specialists. To assist the Contract
Engineer in defining new prices, in preparing amendments to subcontracts and
in analyzing and discussing claims. In Home Office (whenever possible) to cooperate with
the project team for the Constructability and feasibility studies, with APPAL
for technical tabulation of the civil bidders’ proposals and clarification
meeting with the bidders, with civil department to analyze / define the WR to
be included in the Scope of Work of Subcontractor.
|
Person Specification
|
Knowledge & Qualifications
|
|
Experience
|
A minimum of 10-15 years of
hands-on involvement in overseeing EPC projects specifically within the oil and
gas domain. Similar role covered in the
last three projects, must be of a comparable size. Experience working on the EPC
Contractor side
|
Skills and Abilities
|
Attention to detail,
management skills Team-oriented
skills, self-motivation and direction, with strong bias toward
timely performance and problem resolution Strong understanding of construction
processes, building codes, and industry standards. Excellent communication, interpersonal, and
problem-solving skills.
|