Construction Material Assistant
| Date: | 19/03/2025 | 
|---|---|
| Place of work: | Al Jubai, KSA | 
| 
   Job Title:  | 
  
   MLA - Construction Material Assistant - Preservation  | 
 
| 
   Reference:  | 
  
   439901780  | 
 
| 
   Project  | 
  
   AMIRAL P02&03 4398&4399 KSA  | 
 
| 
   Job Location:  | 
  
   Jubail, KSA  | 
 
| 
   Hours/rotation:  | 
  
   Rotation of 60 days on site and 10 days off (2 days travelling)  | 
 
| 
   Salary range:  | 
  
   Competitive salary package with benefits  | 
 
| 
   Benefits:  | 
  
   Single status Full board and lodging on site. Travel to home country in economy class  | 
 
| 
   Job type/Contract:  | 
  
   Contractual, 01-04-2025 till 31-07-2026  | 
 
| 
   Salary range:  | 
  
   Competitive Salary package with benefits  | 
 
| 
   Job summary/Role description  | 
 |
| 
   Tecnimont and Tecnimont Arabia Limited have been awarded two lump-sum turn-key EPC contracts related to a petrochemical expansion at the SATORP Refinery (a JV composed of Saudi Aramco and Total Energies), in Jubail, Kingdom of Saudi Arabia. The overall value of the contracts is approximately USD 2 billion. The contracts relate to the execution of two packages of the complex, namely the “Derivatives Units” package - which includes a butadiene extraction unit, an olefin extraction unit, a methyl tert-butyl ether unit, a butadiene selective hydrogenation unit, a 2nd stage pygas hydrogenation unit and benzene & toluene extraction unit - and the “High Density Polyethylene (HDPE) & Logistic Area” package, which includes two polyethylene units and the relevant product logistic facilities. The project’s scope of work entails complete engineering services, equipment and material supply, construction activities, pre-commissioning, and commissioning, and shall have a duration of approximately 4 years.  | 
 |
| 
   Duties and responsibilities  | 
 |
  
  | 
 |
| 
   Knowledge & Qualifications  | 
 |
  
  | 
 |
| 
   Experience  | 
 |
| 
   
 
  | 
 |
| 
   Skills and Abilities  | 
 |
  
  | 
 |