Static Equipment Assistant
Date: | 03/07/2025 |
---|---|
Place of work: |
Job Title: |
MEA - Static Equipment Assistant |
Reference: |
PIR 439903220 |
Project |
Amiral Petrochemical Project. (Jubail Industrial Complex 2) |
Benefits: |
Single status (Off Rotation Salary Paid) Full board and lodging on site. Travel to home country in economy class on off Rotation. |
Job type/ Contract |
Contractual, 01/07/2025 – 31/07/2026 |
Salary range: |
Competitive salary package with benefits |
Work Schedule: |
6 working days & 1 days of rest. 10Hrs of work per day |
Project |
Amiral Petrochemical Project. (Jubail Industrial Complex 2) |
Job Summary/Role Description |
|
Tecnimont and Tecnimont Arabia Limited have been awarded two lump-sum turn-key EPC contracts related to a petrochemical expansion at the SATORP Refinery (a JV composed of Saudi Aramco and Total Energies), in Jubail, Kingdom of Saudi Arabia.
The overall value of the contracts is approximately USD 2 billion. The contracts relate to the execution of two packages of the complex, namely the “Derivatives Units” package - which includes a butadiene extraction unit, an olefin extraction unit, a methyl tert-butyl ether unit, a butadiene selective hydrogenation unit, a 2nd stage pygas hydrogenation unit and benzene & toluene extraction unit - and the “High Density Polyethylene (HDPE) & Logistic Area” package, which includes two polyethylene units and the relevant product logistic facilities. The project’s scope of work entails complete engineering services, equipment and material supply, construction activities, pre-commissioning, and commissioning, and shall have a duration of approximately 4 years. |
|
Duties and responsibilities |
|
MEA reports to the Supervisor of the relevant discipline.
He collaborates with his own Supervisor in directing Subcontractor activities
within the
He is the first interface between the Subcontractor and the Site Organization
with regard
Within his own area, his main responsibilities are:
To valuate test results, the validity of certificates and related reports,
informing the
To check that Construction works are in accordance with Project
specifications and
To note the work quantities performed by subcontractors and on this basis
prepare
To check the detailed activity plan for his own area and compare it with work Check the implementation of the HSE specification and report all possible anomalies. |
|
Person Specification |
|
Knowledge & Qualifications |
|
|
|
Experience |
|
|
|
Skills and Abilities |
|
|
|
Special Requirements and Comments |
|
Only spontaneous candidates will be considered for this role. |