Job Title:
|
Commissioning Loop Checks
Coordinator
|
|
Reference:
|
PIR 439904300
|
|
Project
|
AMIRAL P02 & 03 4398
& 4399 KSA
|
|
Job Location:
|
Al Jubail, Saudi Arabia
|
|
Job type/Contract:
|
Contractual (Single Status).
Start on as soon as possible
|
|
Starting date
|
ASAP
|
|
Hours/rotation:
|
Rotation of 60 days on site
and 10 days off (paid) & 2 days traveling (paid). 10 hours per day
(including 1 hour break)
|
|
Salary range:
|
Excellent salary package
with benefits.
|
|
Benefits:
|
Single Status.
Accommodation (Meals)
provided by the company.
Transportation provided by
the company.
Round trip ticket on each
rotation (Economy class).
|
|
|
|
|
Job summary/Role description
|
Commissioning
Loop Checks Coordinator executes the activities relevant to functional loop
checks and to the interlock / sequences functionality checks in compliance
with the quality requirements, health / environmental / safety regulations
and following the stated procedures. He
/ she reports to the commissioning control system superintendent. He
/ she is assigned to the project by AVIMP head of department.
|
|
|
|
|
Duties and responsibilities
|
- Cooperate
with the subcontractor, supervise and check the preparation of the loop
folders due time prior to the beginning of the activity.
- Supervises
that all the FLC operations follow the proper flow of documentation and
their timely execution.
- Records
the daily progress of the FLC and ensures its availability to
management, QA / QC, planner etc.
- In
case of deviation of actual progress from the scheduled activities,
implements all the necessary actions involving the management.
- Planning
on daily basis the activity based on the list of the “loops ready to
test”, on the manpower availability and following the priority provided
by commissioning management.
- Manage
the repairs of the instruments that need to be fixed or recalibrated
with the support of the troubleshooting team.
- Records
and transmits to the construction any major problem which requires the involvement
of the construction subcontractor (i.e. cable pulling, instrument
relocation
- etc.).
- Prepare
the forms for all the tests to be performed and ensure submission of the
certificates duly signed by involved parties for final hand over to the
certification engineer (QA / QC).
- Coordinate
actions with the electrical commissioning supervisor in performing the
activity.
- Records
in the master drawings all the modifications done during the FLC (for as
built).
- Signs
the documents (narratives and forms) and follow up for the PMC / client
signatures.
|
|
Person
Specification
|
|
Knowledge & Qualifications
|
- University Degree or Diploma in any Engineering or
equivalent.
|
|
Experience
|
- Minimum
10 years’ experience in HSE in commissioning projects / operations in
the oil & gas or petrochemical industries.
- Relevant
experience in 3 major EPC projects; oil & gas, petrochemical sector.
|
|
Skills and Abilities
|
- Excellent communications and interpersonal
skills.
- Attention to detail, management skills.
- Team-oriented skills,
self-motivation and direction, with strong bias toward timely
performance and problem resolution.
|