Commissioning Engineer (Process)

Date: 03/11/2026
Place of work: Al Ruwais, UAE

Job Title:

Commissioning Engineer (Process)

Reference:

442215350

Project

Hail & Ghasha, 4422 UAE

Job Location:

Abu Dhabi, UAE

Starting date

01-January-27 To 31-December-27

Hours/rotation:

Rotation of 60 days on site and 10 days off (paid) & 2 days traveling (paid)

Salary range:

Excellent salary package with benefits

Benefits:

Single Status.

Accommodation provided by the company.

Transportation provided by the company.

Round trip ticket on each rotation (Economy class).

 

 

Job summary/Role description

  • He cooperates with commissioning group during the pre- commissioning and the commissioning phases as per project requirements.
  • He operates in compliance with the quality requirements, health/environmental/safety regulations and following the stated procedures.
  • He reports hierarchically to the Commissioning Manager or, in complex organizations, to the Commissioning Superintendent. As part of Process Department (PROCS) he functionally reports to Process Manager and to PROCS Head of Department.

Duties and responsibilities

  • Assistance during construction, pre-commissioning and commissioning phase.
  • To assist and advice the Commissioning Manager and the commissioning team in trouble shooting the process problems related to the project.
  • To assist and advise the Commissioning Team in the finalization of pre-commissioning and commissioning procedures.
  • To assist and advise the Commissioning Team in the finalization of utilities, feed stocks and products consumption schedule for pre-commissioning and commissioning.
  • To verify and support CME in the preparation of the procedure for the initial filling of catalysts, chemicals, resins and feed stocks to the equipment and coordinate the a.m. activities.
  • To participate in the rely-upon item (part of technology know-how) internal inspection or verification.
  • To lead in the check of the functionality of interlocks, logic and sequence and ensure that they are in line with process requirements as detailed in the narrative.
  • When requested by the Commissioning Manager to follow the operations in field.
  • Attend the Pre Start Up HSSE survey.
  • Attend the start-up of the machines, packages by supporting the activities and approving temporary modifications to interlock or complex loop as necessary.
  • Verify the operating conditions and, in case of need, provide temporary plant modification to allow machines or packaged units operation.
  • Assist and verify the machine or Vendor packaged unit performance test to ensure compliance with the Process requirement (guaranteed performance).
  • Verify the Vendor performance test final report and advise Vendor coordinator (CVC) or Commissioning Manager regarding completeness or exceptions/clarifications relevant to performed test.

 

 

Person Specification

Knowledge & Qualifications

  • University degree or diploma in relevant discipline or equivalent.

Experience

  • Significant experience in the industrial construction of large or xl gas plants.
  • Covered a similar role in at least 2-3 projects of comparable size.
  • A minimum of 7 years of exp overall
  • Experience working on the Contractor side is preferred.

Skills and Abilities

  • Excellent communications and interpersonal skills
  • Attention to detail, management skills.
  • Team-oriented skills, self-motivation, and direction, with strong bias toward timely performance and problem resolution.

Special Requirements and Comments

  • Attention to detail, management skills